The project involved the fire safety certification of an industrial plant with an area of approximately 9,000 square meters and a total height of about 17 meters.
The mixed structure of reinforced concrete, masonry, and metal carpentry required detailed structural surveys and finite element modeling to verify the structures under fire conditions.